You are here Home News Solar
SOLAR
 September 06, 2010
Photovoltaic Markets Surge to Forefront Amidst Efforts to Locate Viable Renewable Energy Sources: Research
 (Sept.06, 10:40am) With rising awareness about green trends, the future lies in technologies that offer enhanced energy efficient solutions at a low-cost...

 June 17, 2010
Guidelines for small solar plants connected to below 33kV networks
 (Jul.17, 11:10am) The Projects with proposed installed capacity of minimum 100 kW and upto 2 MW and connected at below 33 kV shall fall within this category....

 June 17, 2010
Guidelines for off grid and decentralized solar projects
 (Jun.17, 9:10am) For the year 2010-11, the benchmark price for photovoltaic systems with battery back-up support is considered as Rs.300/- per Wp. In case of the systems, which do not use storage such as water pumping systems, the installed PV system cost is considered as a maximum of Rs.210 per Wp. ...

 June 11, 2010
U.S. solar energy giant forms JV company in India
 (Jun.11, 12:10pm) 50:50 JV with MSM Energy called ICE Solar to provide photovoltaic (PV) solar engineering, procurement and construction to the Indian markets....

 June 01, 2010
Renewable energy capacity soars
 (Jun.01, 9:10am) For the first time, solar farms also made their mark on the grid-connected electricity scene, after remaining in use primarily for non-grid purposes such as isolated lamp posts, hoardings etc.Solar added 8 megawatt (0.008 gw) during the year. ...

 May 20, 2010
Gujarat approves 716MW in solar projects to developers
 (May.20, 6:30pm) Of the 716 MW allotment, the share of Solar Photovoltaic and Solar Thermal technology is 365 MW and 351 MW respectively....

 May 04, 2010
ADB approves investment in 73MW solar power plant in central Thailand
 (May.04, 12:10pm) The Asian Development Bank (ADB) has announced an Asian solar energy initiative to generate some 3,000 megawatts of solar power over the next three years....

 April 08, 2010
RIL Solar commissions 1MW PV project
 (Apr.08, 10:10am) The group installed and commissioned the 1MW solar plant in less than three months. It is expected to generate around 1.4 million units of electricity per year. It would cater to the power requirements of the stadium and the surplus would be fed to the grid at 11KV. 3,640 nos. of 280Wp modules with one of the highest efficiency of 14.1 percent have been used in the project. ...

 February 09, 2010
Kirloskar Brothers to install solar powered pumping system in rural Gujarat
 (Feb.09, 5:10pm) Bags an order for supply, installation, commissioning and testing of solar pumping systems from Gujarat Water Supply and Sewage Board. Project to transform lives of 500 adivasi families in 7 yet to be electrified villages...

 February 01, 2010
Gujarat announces solar power tariff order
 (Feb.01, 8:10pm) GERC decided to adopt Rs.16.50 crore per MW as capital cost for Solar Photovoltaic Power and Rs.13 crore per MW for Solar Thermal Power projects in the state...

 
Page (1) : Showing 1 - 10 Records of 67

1  2  3  4  5  | Next
 
 
 
 
 
CARBON
CLASSIFIEDS
   
more...